Skip to content
induitive

From scattered files
to one study you can defend.

A feasibility study draws on surveys, quotes and drawings from many companies. induitive brings them into one project, finds the figures in each document and links every one to its source, so your partners sign off faster and every number holds up.

How it works

Four steps from files scattered across inboxes and drives to one study every partner has confirmed.

  1. Invite everyone who holds the data

    Add your own team as members, and suppliers, engineers and grid operators from other companies as guests. Guests see only the projects you invite them to.

  2. Upload what you already have

    Surveys, quotes, drawings and spreadsheets, as they are. induitive reads them and lists the figures it finds, each linked to its document and page.

  3. Gather and confirm every figure

    With every upload, the figures gather in one place. The owner of each section accepts or corrects each one, and nothing counts without a source and a name.

  4. Assemble a study you can defend

    Your team writes each section around the confirmed figures. Every number in the study links back to its document, its page and the person who confirmed it.

One view of the whole study

See every section, who owns it and what is still missing. Try it: accept the figures waiting for review below.

Oberaargau biomethane plant

Aare Energie AG, 2 of 5 sections complete

  • Site and land

    Sara Keller, Aare Energie

    Approved
  • Feedstock supply

    Lena Moser, Agro Oberaargau (guest)

    3 figures to review
  • Grid connection

    Marc Dubois, Réseau Jura Gaz (guest)

    Waiting for capacity study
  • Permitting

    Sara Keller, Aare Energie

    Approved
  • Economics

    Tobias Huber, Aare Energie

    Not started
ExampleA biomethane project: four figures from four companies, each linked to its document, its page and the person who provided it.Site plan of a biomethane project: farms within a 15 km catchment supply the plant, which connects to the gas grid. Four figures are marked, each linked to its source document and the person who provided it.
  1. Feedstock

    18,400 t/year

    Cattle manure available within 15 km

    Substrate survey 2026.pdf

    Page 4Lena Moser, Agro Oberaargau

  2. Grid connection

    2.1 km

    Pipeline from the plant to the grid injection point

    Capacity study Réseau Jura Gaz.pdf

    Page 2Marc Dubois, Réseau Jura Gaz

  3. Haulage

    12 km

    Average haul distance to the plant

    Logistics study 2026.pdf

    Page 9Tobias Huber, Aare Energie

  4. Site

    1.4 ha

    Plant parcel in the agricultural zone

    Land register extract.pdf

    Page 1Sara Keller, Aare Energie

  • Cited figure
  • Farm
  • Plant
  • Road
  • Gas grid
  • New pipeline
  • 15 km catchment

Bring your next study together.

Start with one project and the documents you already have. Invite your partners when you're ready.

Create a project